Entradas

Ensa participated in the Meeting with the Talent hosted by the ETS of Industrial Engineers and Telecommunication of the UC

Maliaño, March 20th 2019.- Equipos Nucleares S.A., S.M.E participated in the third edition of the Meeting with the Talent hosted by the ETS of Industrial Engineers and Telecommunication of the Cantabrian University .

The aim of this event was brought the student near to the companies, to put them in touch with the labor market. The most important companies in the region participated in it. Ensa was one of them together with its subsidiary, Enwesa. There, the student have the chance to know their products, services and activity and also to provide them the delivery of their resume to possible work practices.

For the state company established at Maliaño this meetings are very productive because improve the approach of companies with the talent of the students and offer the opportunity to find different profiles that fit what it needs.

Ensa participated in the International Nuclear Power Plants Summit in Istambul

Maliaño, March 11st 2019.- Equipos Nucleares S.A., S.M.E has been with the Cluster of the Nuclear Industry of Cantabria , in the 6th edition of the Congress and Exhibition of nuclear power plants – International Nuclear Power Plant Summit celebrated in Instambul.

The event, considerate as a reference date in the nuclear sector in Turkey, joined all supplier of the nuclear supply chain with the main buyers, decision makers and potential partners. There the state company located in Maliaño had the chance to show their products and services, show its capacities in the nuclear industry, update the latest industry developments and networking opportunities to explore new ways of collaboration.

The Advanced Technology Center of Ensa cooperate with Navantia improving the developments in the design and production of a component for a new submarine

Maliaño, March 5st, 2019. – The Advanced Technology Center of Equipos Nucleares S.A., S.M.E  , with other technologies centers as CTC, Eurocontrol and CADE, made an advisory and consulting work  to Navantia shipyard in the design and manufacturing review of one of the integrating components of the new S-80 submarines.

Through different analysis and calculations, in addition to ensuring compliance with the ASME standard, it was verified that these components of the submarine were safe for installation.

Ensa develops two news processes of protection against the corrosion of the sealing gaskets of its ENUN cask

Maliaño, March 1st 2019.- Equipos Nucleares S.A., S.M.E has developed two news alternatives for the recharge processes in the seat area of the sealing gaskets thanks to a subsidy of the line INNOVA 2017 of de Department of Innovation, Industry, Tourism of the Cantabrian government.

The main purpose of the project consists in the improvement of the productivity and competitiveness of metal casks of the ENUN family of new manufacturing in the protection of the board area against to corrosion. For that, Ensa has developed two alternatives and complementary lines thanks to the introduction of new technologies.

Therefore, Ensa has developed the robot application of weld CMT, which allow the performance of recharge the sealing gasket with a high metallurgic quality and an important rise in productivity. This is possible thanks to the improvement of the welding device, as well as the system robotization that allows covering any type of complex geometry.

Ensa received students of the intermediate level of Mechanid of Salesianos school

Maliaño, February the 26fst of 2019.- Equipos Nucleares S.A., S.M.E  received the visit of the second-year students of the intermediate level of Machined of Salesianos school at Santander.

The group was welcomed with a presentation of the company where the main products designed and manufactured and the services offered to the nuclear industry were shown.

The visit continued in the Advanced Technology Centre where they observed, among others, tensile tests and impact tests with Charpy pendulum.

The meeting finished in the factory where they could see the main components and products in differents stages of manufacturing. Also the group observed the operation of specific machines such as grinding machines, boring machines, broaching machine and the vertical lathe and it was explained to them the work carried out in the clean area.

Ensa successfully loads the first two ENUN 32P casks in Trillo NNPP

Maliaño, January the 24th of 2019. – Equipos Nucleares S.A., S.M.E successfully completed the loading of the second ENUN 32P cask at Trillo Nuclear Power Plant in Guadalajara. The cask was transferred to its storage position in the Individual Spent Fuel Storage Installation (ISFSI of the plant, where 2 ENUN 32P casks and 32 DPT casks, also designed, manufactured and loaded by Ensa, are stored.

With the loading of these casks, carried out in collaboration with Enwesa S.A., S.M.E, a subsidiary of Ensa, the first load campaign of the ENUN 32P casks was successfully completed and the process of starting up was completed. This process was previously initiated by the modification of auxiliary equipment and the performance of cold trials.

ENUN 32P casks, designed and manufactured by Ensa, allow the transport and storage of spent fuel. These first campaigns of loads carried out in Almaraz NNPP and Trillo NNPP suppose putting in service this cask model of the ENUN series.

Ensa supplied Almaraz NPP with a long pendular tool

Maliaño, January 21st, 2019.- Equipos Nucleares SA, SME delivered the long pendular spent fuel handling tool , successfully completing the assembly at the Almaraz NPP in Cáceres and the Site Acceptance Test consisting of handling with a dummy element in the spent fuel pool of Unit I of said plant.

This tool has been designed for handling fuel elements located in the spent fuel pool, in areas inaccessible to other tools existing to date in the plant. This special lifting device is part of the family of pendular tools in which Ensa is specialized. Its design is patented since 2014 and has been supplied to plants such as José Cabrera NPP , Almaraz NPP I and II, Ascó NPP I and II and Yonggwang NPP III and IV.

The pendular tool incorporates technological advances that optimize the balancing of the tool during the grip of the fuel element, providing a fast and reliable response.

Ensa collaborates with the University of Cantabria and the CSIC in a project on non-destructive ultrasonic testing techniques

Maliaño, December 17th, 2018 – Equipos Nucleares S.A., S.M.E collaborated with the University of Cantabria and the Higher Council for Scientific Research in a project related to the techniques of non-destructive testing by ultrasound whose objective was that the Cantabrian company improve its training in two new generation techniques Phased Array and TOFD.

The execution of this project is translated in terms of innovation for Ensa, due to the fact that the advanced ultrasound tests can contribute to guarantee the quality of the welds in the welding station itself.

This collaboration has served to launch a new inspection technology project aimed at robotizing tests for the ITER project with which the Cantabrian company and the UC will continue working together.

The project was financed by the Ministry of Innovation, Industry, Tourism and Trade of the Government of Cantabria through the European Regional Development Fund .

PARTICIPANTS IN THE COROMA PROJECT hold their general meeting in Ensa

Maliaño, November 13, 2018 – The European project COROMA, in which Equipos Nucleares S.A., S.M.E participates as an end user, continues and the second anniversary of its beginning is celebrated, two working days were organized in the company’s facilities. The main objective was to expose the most significant advances of this important project whose aim is to develop an autonomous modular robot, easily programmable, safe in its interaction with humans and other machines and able to adapt to changes in its environment.

The first day was of a technical nature and served to share their experiences. In the different presentations details of their developments were shown and the operation of their modules was explained. At the end of the day, all the participants visited Ensa’s workshop and showed their interest in the processes and components it manufactures.

The second day was attended by two experts in charge of evaluating the work carried out. After the presentations of those responsible for each of the work packages and the subsequent analysis, the evaluators showed their good impression of the level reached so far in each of the sections.

In the following months, work will continue on the integration of the different modules, after which, in the last four months of 2019, final tests will begin on the applications proposed by end users.

The COROMA project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 723853.

Ensa assisted to the 12th General Assembly of CEIDEN

Equipos Nucleares S.A., S.M.E assisted to the 12th General Assembly of the Nuclear Fission Energy Technology Platform held at the Ministry of Science, Innovation and Universities.

During the session, the latest developments regarding energy policy were discussed and the main technical programmes of the platform were presented, among which the analysis of national investments in nuclear R&D+i corresponding to 2016 stood out. It also hosted the conference “The Integrated Energy Network” held by representatives of the Electric Power Research Institute .

The objectives of CEIDEN, of which Ensa has been a member since its beginnings in 2007, are to coordinate the different national R&D plans and programmes, as well as participation in international programmes, trying to coherently guide the efforts of the entities involved.

The Cantabrian company was represented by Luis Magdalena, coordinator of R&D Improvements and Javier Matarredona, from the Marketing and Sales Department.